Subscribe:

Labels

Wednesday, February 6, 2013

To develop Dash boards using PPS in sharepoint 2010

Steps:

  1. Configure Secure store Service in SA
  2. Create Performance point Services
  3. Configure PPS with Secure store Account 
  4. Do the Performance Point Service Application Settings 
  5. Create a Site Collection with Business Intelligent Center template 
  6. In this Site collection Create one list and library those are 
  7. Performance point list 
  8. Data connection library
  9. After this u need create new connection in Data connection library 
  10. In performance point list u need click on the new item. 
  11. If it 1st time it will run Dashboard desighner window to install. 
  12. It will open the Dashboard designer 
  13. In this Designer u need to create according to ur req. 
  14. Like Scorecard or KPI or Filter or Reports etc. 
  15. If u can select Score Card it will ask to select the data source. 
  16. In after this u can design based on the dimensions and measure.
These are major steps to create Dashboards using PPS (Performance point service) in sharepoint 2010