Steps:
- Configure Secure store Service in SA
- Create Performance point Services
- Configure PPS with Secure store Account
- Do the Performance Point Service Application Settings
- Create a Site Collection with Business Intelligent Center template
- In this Site collection Create one list and library those are
- Performance point list
- Data connection library
- After this u need create new connection in Data connection library
- In performance point list u need click on the new item.
- If it 1st time it will run Dashboard desighner window to install.
- It will open the Dashboard designer
- In this Designer u need to create according to ur req.
- Like Scorecard or KPI or Filter or Reports etc.
- If u can select Score Card it will ask to select the data source.
- In after this u can design based on the dimensions and measure.
These are major steps to create Dashboards using PPS (Performance point service) in sharepoint 2010


